Spring, Summer, Fall

10-25-2011

As we posted previously, Holding Pattern’s deinstallation was as much a beginning as it was an end, since the project was based on the idea that we could design things that would be needed by businesses in the neighborhood.

The images to the right show the project coming full-circle: in the Spring, we made matches between things MoMA PS1 needed and things the neighborhood needed; in the Summer, we arranged the furniture and trees we designed and built in a holding pattern; now that it is the Fall, we’re starting to deliver the furniture and trees to their new homes in Long Island City.

< Back to Index